Joined
·
746 Posts
Rainy day today so put in about 8 hours today fitting frame connectors, put axels in the housing set 4-link bars to equal lengths to get starting point.
cut out the rest of the floor that I won't be using and completely welded the connectors inside the front sub frame which actually is still pretty good steel, the toe board is swiss cheeze which I will replace but the new floor will be aluminum up to where I made the cut. Couldn't resist had to roll it out of the garage! And the pics are in the photobucket link below:yes:
:beer::beer:
cut out the rest of the floor that I won't be using and completely welded the connectors inside the front sub frame which actually is still pretty good steel, the toe board is swiss cheeze which I will replace but the new floor will be aluminum up to where I made the cut. Couldn't resist had to roll it out of the garage! And the pics are in the photobucket link below:yes: